Project Title
2 x 150MW Power Plant Raw Water Intake Project
Client
DMCI Power Corporation
Location
Calaca, Batangas
The coal-fired power plant expansion requires a separate fresh water intake system. The scope of works includes hydrological and hydraulics study to locate the best intake point possible and designing the ancillary structures such as the bank protection, weir, stilling basin, storage pond, pump system and conveyance system.